Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Garage Conversion ADU in Brea: What It Takes
A garage conversion ADU in Brea turns an attached or detached garage into a legal, rentable living unit, usually one bedroom or a studio with a kitchenette and full bath. Plan on 4 to 6 months from permit submittal to final inspection, and budget $45,000 – $130,000 depending on slab work, plumbing relocation and finish level. Call (833) 522-5059 for a free on-site estimate.
How we run a garage conversion, stage by stage

Every converted garage moves through the same five stages, and the decisions you make in the first two determine what the next three cost. Here’s the real sequence.
Stage 1 – Assessment and design (weeks 1 – 3). We open the garage, check the slab, locate the existing plumbing and panel, and confirm whether the structure can take a second point of egress. This is where you decide your layout: studio with a kitchenette, or a one-bedroom with a separate bath. You also pick your exterior finish at this stage so materials can be ordered before framing starts.
Stage 2 – Permits and engineering (weeks 3 – 8). We submit to the city with stamped plans, and if the garage shares a wall with the house we order a structural review for the opening between the two. You’ll get your first inspection scheduled before demo begins. This is often the longest stretch, so it pays to have plans ready before you list the space for rent.
Stage 3 – Demo and rough-in (weeks 9 – 13). Out comes the garage door and opener, the old slab is evaluated for pour-over or replacement, and we frame the new walls, run plumbing, pull electrical, and install the HVAC split or mini-split. Day one of this stage is demolition, day three is usually the slab decision, and by the end of week four your plumbing and electrical rough-in is ready for inspection.
Stage 4 – Insulation, drywall, finishes (weeks 14 – 19). Insulation, drywall, taping, then flooring, kitchenette cabinetry, bath tile and fixtures. You approve the finish schedule and the appliance list here. Most of the visible quality of the unit is decided in these six weeks.
Stage 5 – Final inspections and punch list (weeks 20 – 24). Electrical, plumbing, mechanical, and building finals get signed off, then we walk the unit with you and close the punch list. That sign-off is also what you’ll need if you plan to rent the unit.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll choose between
- Slab-over vs. new pour: Patching and pouring over the existing slab runs $4,000 – $9,000 and works when the concrete is sound; a full replacement costs more but resolves drainage and cracking you’d otherwise chase.
- Mini-split vs. ducted HVAC: A mini-split is cheaper to install and easier to run in a converted garage with no existing ductwork; ducted systems cost more upfront but condition the space more evenly.
- Kitchenette vs. full kitchen: A compact kitchenette keeps the permit simpler and costs less; a full kitchen adds resale value but can push the unit over the size threshold where the city requires more egress and parking review.
- Panel upgrade vs. subpanel: Older 100-amp panels in Brea’s 1950s – 70s stock often need a subpanel at minimum; a full upgrade is worth it if you plan to add EV charging later.
- Exterior cladding: James Hardie fiber cement holds up well against the Santa Ana wind and sun; stucco matches the surrounding tract homes and can cost less on simple walls.
- Garage door wall: Replacing the opening with a framed, insulated wall is standard; keeping the door as a facade with a full wall behind it is a common look on street-facing garages.
What Garage Conversion ADU costs in Brea, CA

Expect $45,000 – $130,000 for a completed garage conversion ADU in Brea. Most jobs land in the $60,000 – $85,000 range once plumbing, electrical and finish are accounted for.
| Line item | Typical range |
|---|---|
| Demolition, slab prep and framing | $6,000 – $18,000 |
| Plumbing rough-in and fixtures | $5,000 – $14,000 |
| Electrical and panel work | $4,000 – $12,000 |
| HVAC (mini-split or ducted) | $3,000 – $9,000 |
| Insulation, drywall and paint | $5,000 – $12,000 |
| Kitchenette and bath finishes | $8,000 – $25,000 |
| Flooring, doors and trim | $3,000 – $9,000 |
| Permits and engineering | $2,500 – $8,000 |
The variables that push a job toward the high end: relocating plumbing across the slab, a full electrical panel upgrade, structural work to open a shared wall, higher-end finishes, and any need to expand the footprint. A written estimate from us covers materials, labor, permit fees and final inspection; it does not cover landscaping or separate drainage work, which are quoted separately. A $1,000 discount applies to projects over $10,000, and 0% financing for 18 months is available. All work is backed by our 730-Day Done Right Promise.
See the difference
Before
After
Before
After
Before
AfterWhat Brea homes specifically do to this job
Brea splits two ways, and each side changes how a garage conversion goes. In the historic downtown core and older tracts around the 92821 flats, garages sit on original slabs poured in the 1950s – 70s, and the clay-heavy soil there shifts with the wet and dry seasons. That means crack evaluation is part of every quote, and we often find abandoned oil-field sumps or old well casings under mid-century lots, which complicates excavation. In Blackstone and La Floresta, the hillside build-outs use post-tension slabs, which drill differently and require engineering sign-off before we cut. The fall Santa Ana winds that funnel through the Brea-Olinda corridor drive real demand for fire-rated assemblies and ember-resistant vents, so we spec those on the exterior. Homes across the 92821, 92822 and 92823 ZIP codes each see inspections handled by the same city building department, and we pull permits on every conversion. This is the kind of scope we handle in Brea, and we also work Placentia, Fullerton, Yorba Linda and La Habra with the same approach.
Serving Brea, CA – Our Local Coverage Area
We serve Brea and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Garage Conversion ADU in Brea

Most conversions take 4 to 6 months from permit submittal to final inspection, with permits and engineering taking the longest single stage. Call (833) 522-5059 for a timeline built from your specific garage.
Yes. Any garage conversion ADU requires building, electrical, plumbing and mechanical permits from the city. We pull every permit and schedule every inspection; you don’t file anything yourself.
Often yes, when the existing garage already sits near the house’s plumbing wall and the shared structure can take the load. When we need to cross the slab with drains or open a shared wall, that work adds cost and time. The on-site assessment tells us which case you’re in.
Roughly $45,000 – $130,000, with most jobs in the $60,000 – $85,000 range. The biggest cost drivers are slab condition, plumbing relocation, electrical panel capacity and finish grade. Call (833) 522-5059 for an exact quote; estimates are free.
Every garage conversion ADU is backed by our 730-Day Done Right Promise. If something we built isn’t right, we make it right within that window. The promise covers workmanship; manufacturer warranties cover materials separately.
Get a free on-site estimate for your Brea garage conversion
If you’re planning a Garage Conversion ADU in Brea, call (833) 522-5059 to schedule a free on-site estimate. We’ll walk the garage, check the slab and panel, talk through layout, and hand you a written line-item quote with a clear scope. Any wider additions scope, or paired work like Asphalt Driveways & Resurfacing in Brea or Concrete Driveways & Concrete Work in Brea, gets quoted separately as part of a full Home Additions & ADU in Brea plan.